Home / Answers / CTK & Tool Control

What should QA check for CTK and tool accountability?

When QA inspects a composite tool kit (CTK) and tool accountability, they verify tools are marked and inventoried against a master list, that shift and pre-use inventories happen, annual kit reviews are documented and signed, lost-tool investigations are initiated, and that no uncontrolled tools reach the flightline. Requirements apply equally to all decentralized CTKs, tools, and equipment.

Readers asked this on CheckMyRegs and CheckMyAFI 18 times — this page answers it from the official catalogs and the publications’ own text.

The controlling publication in each branch

BranchControlling publicationDatedSource
Air ForceDAFI 21-101 Current
CTK design, marking, inventory and accountability requirements
2023-12-20Official link
ArmyAR 750-1 Current
Army materiel maintenance policy
2026-04-29Official link
NavyOPNAVINST 4790.2K Current
Naval aviation maintenance tool control
2025-04-25Official link
Marine CorpsMCO 4790.25 Current
Ground equipment maintenance program
2014-01-12Official link
Air ForceHOLLOMANAFBI 21-380 Current
Local CTK/ITK inventory timing and control
2019-11-08Official link
Air ForceWRIGHTPATTERSONAFBI 21-201 Current
Master inventory list validation and signed annual review
2022-09-13Official link
Air Force36WGI21-110 Current
Lost tool reporting and FOD/DOP accountability
2025-06-03Official link
Air Force452AMWI21-102 Current
CTK program, warranty tools, tool pouches
2021-05-21Official link
Air ForceDAFI 21-106 AMC Sup TRAVISAFB Sup Current
Lost tool investigations and equipment accountability
2024-09-01Official link
Publication numbers, dates, and statuses resolve live against each branch’s official catalog every time this page loads — when a service revises its reg, this page follows. Quotes below are extracted verbatim from the official PDFs. Verify the controlling copy before citing it.

What the regulation actually says

Marking and quick inventory

Confirm CTKs are designed for quick inventory and that kits and tools are clearly marked with the Equipment Identification Designator.

“8.3.3. Design CTKs to provide for quick inventory and accountability of tools. CTKs and tools will be clearly marked with the Equipment Identification Designator ( EID) (follow guidance below). (T-3)”

Validate against master list

Check that every tool in the kit reconciles against the tool accountability system's Master Inventory List for validity and verification.

“3.1.1. Tools assigned to the CTK will be checked against TCMax, or a MAJCOM approved or locally approved tool accountability systems Master Inventory List ( MIL) for validity and verification.”
— WRIGHTPATTERSONAFBI 21-201, ¶3.1.1, p.7 · official PDF

Shift and pre-use inventories

Verify CTKs are inventoried at shift start or before entering the airfield, and inspected prior to each use if stored on the airfield.

“2.2.2. Composite Tool Kit (CTK) and Individual Tool Kit (ITK) will be inventoried either at the start of the shift or before entering airfield environment. If the CTK/ITK is already located on the airfield (continuously stored in a locked shelter) and is not used on a daily basis, it will be inspected prior to each use.”

Documented annual review

Ensure each kit has a documented, signed annual review and that the most current signed inventory is kept inside the CTK.

“3.1.2. Annual review for each kit will be documented and signed in TCMax, or a MAJCOM approved or locally approved tool accountability system. The most current signed MIL inventory will be kept in CTK’s and Tool Kits.”
— WRIGHTPATTERSONAFBI 21-201, ¶3.1.2, p.7 · official PDF

Lost-tool investigations

Confirm personnel initiate a lost-tool investigation for any missing tool, CTK, or item lost in a maintenance area.

“3.7.1. All personnel will initiate a lost tool investigation for any lost or missing tools, CTKs, test equipment, aircraft/equipment parts, technical data, PPE, or any personal issue items, etc. lost anywhere in an aircraft maintenance area.”
— DAFI 21-106 AMC Sup TRAVISAFB Sup, ¶3.7.1, p.13 · official PDF

No uncontrolled tools

Check that no personal or uncontrolled tools are present on the flightline or in maintenance areas.

“2.2.3. Tools not controlled through CTK procedures are not authorized on the flightline or in any maintenance area. EXAMPLE: personal Mini Maglite flashlights, Leatherman, Buck Knives. Chapter 3 INVENTORY REQUIREMENTS”
— WRIGHTPATTERSONAFBI 21-201, ¶2.2.3, p.6 · official PDF

Ask a follow-up

Need this narrowed to your branch or a specific paragraph? Ask it here — free, and the answer quotes the regulation text where we have it indexed.

Related answers

Updated 2026-08-01. CheckMyRegs is an unofficial index — always cite the official publication.