30SWI32-901 — Facility Closure/Turn In Procedures
30SWI32-901 is listed as current Current
in the AF e-Publishing catalog as of our last index refresh (2026-07-11). Note: its publication date is 2020-10-28 — 6 years old — so check for newer interim changes before citing it.
| Branch | U.S. Air Force |
| Series | 30SWI |
| Publication date | 2020-10-28 (5.7 years ago) |
| Status | Current |
| Proponent / OPR | SLD30 |
| Source of record | AF e-Publishing |
Official document (AF e-Publishing)
Watch this publication
Get an email if 30SWI32-901 is revised, superseded, or rescinded.
Nearby in the 30SWI series
- 30SWI24-302 — Vehicle Accident, Abuse, And Fuel/Idling Program Current
- 30SWI31-106 — Installation Curfew Procedures Current
- 30SWI32-7001 — Conservation, Management And Enforcement Current
- 30SWI33-112 — Spectrum Management Current
- 30SWI34-201 — Vandenberg Air Force Base Honor Guard Program Current
This is an unofficial index built from the public catalog. The controlling copy is
always the one on
AF e-Publishing — verify there
before citing 30SWI32-901 in an official product.