| Branch | U.S. Air Force |
| Series | AFI |
| Publication date | 2017-10-06 (8.9 years ago) |
| Status | Current |
| Proponent / OPR | AF/A3 |
| Source of record | AF e-Publishing |
Download PDF Official document (AF e-Publishing)
This instruction outlines the guidance, process, and rules by which the Combat Air Forces (CAF) Aviation Scheduling Integrated Product Team (SIPT) schedules CAF aviation assets. It includes the Aviation SIPT’s role in the development, approval, and maintenance of the CAF Aviation Schedule (AS).
This document is substantially revised and must be completely reviewed. Chapter 1 introduces the CAF Force Generation (CAFFORGEN) Model as the principal means of implementing Global Force Management (GFM) as it relates to CAF contingency scheduling. Chapter 3 includes an extensive rewrite of the Air Force orders process which mimics that of the Global Force Management Allocation Plan (GFMAP). Chapter 4 provides an updated discussion of the contingency scheduling process and includes new sections on CAF mobilization and pre-deployment training requirements. Minor changes have been made to Chapter 5 to account for a change from a four month training build to a six month training build. Chapter 6 includes time-lines for completion of Aviation Change Requests (ACRs) and for submission of MAJCOM Aviation Schedule (CPS) requirements. Attachment 5 has been added to explain the automated tool suite maintained on the ACC Operations Center Website
Publications state their own changes on page 1 — behind a PDF the official host will not serve to a search engine. This is that section, verbatim. It describes the edition above, not every historical change.