Home / Navy / OPNAVINST / OPNAVINST 4440.19G

OPNAVINST 4440.19G — POLICIES AND PRIORITY RULES FOR CANNIBALIZATION OF OPERATIONAL EQUIPMENT AND DIVERSION OF MATERIAL AT CONTRACTOR PLANTS TO MEET URGENT OPERATIONAL REQUIREMENTS

OPNAVINST 4440.19G is listed as current Current
in the DON Issuances (DONI) catalog as of our last index refresh (2026-10-05). Status is mirrored from that catalog, re-checked weekly — every change is logged. Note: its publication date is 2021-05-11 — 5.4 years old — so check for newer interim changes before citing it.

Download PDF Official document (DON Issuances (DONI))

BranchU.S. Navy
SeriesOPNAVINST
Publication date2021-05-11 (5.4 years ago)
StatusCurrent
Proponent / OPRN4
Source of recordDON Issuances (DONI)

Who this publication applies to

This instruction is Navywide in scope and applies to all equipment, compon ents, assemblies and items contained therein, as well as all organizations involved with the operation and support of Navy and Marine Corps aircraft and Navy ships and submarines. This instruction directs all levels of command to actively pursue appropriate courses to properly manage cannibalizations and diversions. Requests for cannibalization of Strategic Weapon System and Attack Weapon System material under design control of Director, Strategic Systems Program will be processed per reference (a).
Watch this publication
Get an email if OPNAVINST 4440.19G is revised, superseded, or rescinded.

Nearby in the OPNAVINST series

This is an unofficial index built from the public catalog. The controlling copy is always the one on DON Issuances (DONI) — verify there before citing OPNAVINST 4440.19G in an official product.