Download PDF Official document (AF e-Publishing)
| Branch | U.S. Air Force |
| Series | OSANABI |
| Publication date | 2025-02-20 (1.6 years ago) |
| Status | Current |
| Proponent / OPR | OSAN AB |
| Source of record | AF e-Publishing |
This document has been substantially revised and must be completely reviewed. Major changes include: defined parallel runway operations and procedures throughout, removed Alternate Landing System operations to give way to using the 51 FW Alternate Landing Surface Plan as source document, updated noise abatement procedures for engine runs, runway and taxiway information data moved to Attachment 2, updated visual flight rules arrival and traffic pattern, revised night vision device op erations, and removed Attachments 11, 13, and 15
Publications state their own changes on page 1 — behind a PDF the official host will not serve to a search engine. This is that section, verbatim. It describes the edition above, not every historical change.