OPERATIONAL LOGISTICS SUPPORT PLAN (OLSP) FOR THE 49' BUOY UTILITY STERN LOADING (BUSL) BOAT reads like a Maintenance & Flightline question — these are the publications that govern it in each branch:
| Publication | Branch | Title | Date | Status |
|---|---|---|---|---|
| DAFI 21-101 | Air Force | Aircraft And Equipment Maintenance Management | 2023-12-20 GM 2026-03-16 | Current |
| AR 750-1 | Army | ARMY MATERIEL MAINTENANCE POLICY | 2026-04-29 | Current |
| OPNAVINST 4790.2K | Navy | THE NAVAL AVIATION MAINTENANCE PROGRAM | 2025-04-25 | Current |
| MCO 4790.25 | Marine Corps | GROUND EQUIPMENT MAINTENANCE PROGRAM (GEMP) | 2014-01-12 | Current |
| DA PAM 738-751 | Army | FUNCTIONAL USERS MANUAL FOR THE ARMY MAINTENANCE MANAGEMENT SYSTEM - AVIATION | 2014-02-28 | Current |
| TO 00-20-1 | Air Force | Aerospace Equipment Maintenance Inspection, Documentation, Policies, And Procedures | 2023-12-19 | Current |
| COMDTINST M4081.14 | Coast Guard | OPERATIONAL LOGISTICS SUPPORT PLAN (OLSP) FOR THE 49' BUOY UTILITY STERN LOADING (BUSL) BOAT | 2001-11-07 | Not in the current catalog |
| COMDTINST M16114.22A | Coast Guard | 49 FOOT BUOY UTILITY STERN LOADING BOAT OPERATOR'S HANDBOOK | 2006-07-18 | Not in the current catalog |
| COMDTINST 4000.12 | Coast Guard | OPERATONAL LOGISTICS SUPPORT PLAN (OLSP) FOR THE ACQUISTION OF BAR CODE EQUIPMENT FOR THE U.S. COAST GUARD | 1995-10-13 | Current |
| OPNAVINST 3501.198D | Navy | REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATION ENVIRONMENT FOR THE T-AK, T-AKR, T-AKE AND T-ESD ASSIGNED TO THE MARITIME PRE-POSITIONING FORCE AND THE AVIATION LOGISTICS SUPPORT | 2022-01-13 | Current |
| OPNAVINST F3501.407 | Navy | REQUIRED OPERATIONAL CAPABILITYAND PROJECTED OPERATIONAL ENVIRONMENTFOR FLEET LOGISTICS SUPPORT MULTI-MISSION SQUADRON FIVE ZERO FLEET REPLACEMENT SQUADRON | 2021-03-17 | Current |